There is less visible change to report on since the end of last week, although there are still plenty of workers in the building and lots going on. In the auditorium, all the old raking has now been removed and most of the ceiling has now been insulated and replaced. There are three scaffolding towers roaming around and these will be used to paint the ceilings (in Playhouse Black) very shortly. As soon as that has been achieved, then the wooden floor that covers the swimming pool will be removed along with the supporting brick pillars to enable the new floor to be constructed.